20 | XSERIES G5 START UP GUIDE | 2106001MNAA
Figure 2-3: XFC with XIMV and 5-valve manifold
Legend XFC with XIMV and 5 valve manifold
1 High side equalizer valve 4 XIMV
2 Manifold vent valve 5 Enclosure
3 Low side equalizer valve
2. Connect the pressure device to the test port.
3. Apply pressure to the port based on the transducer range (100% of
range).
4. Squirt liquid leak detector onto the following connections:
High and low pressure tap valve connections
High and low pressure manifold tubing connections
Connection points between the flange and the manifold
Bubbles in the liquid indicate a loose or poor connection.
5. Use a wrench to tighten connections, and recheck.
NOTICE Equipment damage: Do not over-tighten the connections.
After verification that all connections are leak-free, proceed to install the
RTD.
Install and connect the RTD for the XFC
The RTD probe measures flowing gas temperature. The following procedure
describes:
Installation of the RTD onto the meter run