EasyManua.ls Logo

Ablerex 3 MS series - Chapter 3: Field Calibration Guide

Ablerex 3 MS series
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Chapter Three: Field Calibration Guide
3.1. Introduction
There are several variable resistors(SVR or potential-meter) and jumpers
on the PCB. They are used for the adjustments of set points which vary
from different electrical applications.
3.2.Tools Required
Tools Description
1. AC Source : To offer an input power 100/110/120 or
220/230/240Vac to the UPS.
2. Multi Meter : To measure the Input Voltage and Battery Voltage
of the UPS
3. Power Meter : To measure the Output Voltage and Output Power
of the UPS.
4. Resistance Load : Bulb Fixture(700W/1400W/2100W)
5. Screw Driver : flat-type, cross-type
3.3. Technical Data
3.3.1. Battery Charging Voltage(25 C)
Set point
Model
Battery Charging Voltage
1. MS1K 41.4VDC +/-0.5V
2. MS2K 82.8VDC +/-0.5V
3. MS3K 110.4VDC +/-1.2V
3.3.2. Setpoints for Battery Low and Battery Cutoff
Model Battery Low Battery Cutoff
1. MS1K 32.4V +/-0.5VDC 28.8+/-0.5VDC
2. MS2K 64.8V +/-0.5VDC 57.6V +/-0.5VDC
3. MS3K 86.4V +/-0.5VDC 76.8V +/-0.5VDC
3.3.3. Fuse Rating(for Standard Models)
Model No.# MS1K/MS1KR MS2K/MS2KR MS3K/MS3KR
DC Fuse 40A/20A*2 20A*2 20A*2
AC Fuse for
230Vac
10A/250V 20A/250V 25A/250V
AC Fuse for
120Vac
20A/250V 25A/250V 50A/250V

Related product manuals