EasyManua.ls Logo

advantest corporation TR5821 - Period M Easurem Ent; Time Interval Measurement

Default Icon
109 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-3-5. Period Measurement (PERIOD B)
(7) POWER ON and check for CHECK operation.
@ Set FUNCTION to PERIOD B.
(3) Connect the signal to be measured to INPUT B.
(4) Set the SEP./COM. A switch to SEP.
(?) Set each switch according to the signal to be measured.
(6) Select a MULTIPLIER according to the required precision.
3-3-6. Time Interval Measurement (T.l. A B)
3-18