EasyManua.ls Logo

AEC IST5015 - Installation of Internal Battery

Default Icon
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IST5 Tower UPS 10kVA~40kVA User Manual 45
Safety Precautions
Daily inspection is very important!
Check and confirm the battery connection is tightened regularly, and make sure there is
no abnormal heat generated from the battery.
Warning
If a battery has leakage or is damaged, it must be replaced, stored in a container resistant
to sulfuric acid and disposed of in accordance with local regulations.
The waste lead-acid battery is a kind of hazardous waste and is one of the major
contaminants controlled by government.
Therefore, its storage, transportation, use and disposal must comply with the national
or local regulations and laws about the disposal of hazardous waste and waste
batteries or other standards.
According to the national laws, the waste lead-acid battery should be recycled and
reused, and it is prohibited to dispose of the batteries in other ways except recycling.
Throwing away the waste lead-acid batteries at will or other improper disposal
methods will cause severe environment pollution, and the person who does this will
bear the corresponding legal responsibilities.
6.2.4 Installation of internal battery
For 10kVA to 30kVA UPS with internal battery, the cable within the battery string is
not provided as standard; if required, please contact your local agency.
There are 40 batteries of 12AH to be installed, which are divided into 4 layers.
Fig.6-1 is the installation of battery of the 10-15kVA standard UPS.
1Dismantle the covers and crossbeams 2Install battery and fix the crossbeams

Related product manuals