CHAPTER 2 – INSTALLATION
OMM-0086_0D AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 35 of 210
GF-133 Ph.: 800-526-0288 03/20/14
Figure 2-14: Sequencing Valve Installed
3. Remove the jumper wire from the Molex connector and then plug it into the sequencing
valve’s connector.