Benchmark 6000 Boiler Installation, Operation & Maintenance Manual
CHAPTER 7 – MAINTENANCE
OMM-0086_0D AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 91 of 210
GF-133 Ph.: 800-526-0288 03/20/14
CHAPTER 7. MAINTENANCE
7.1 MAINTENANCE SCHEDULE
The unit requires regular routine maintenance to keep up efficiency and reliability. For best
operation and life of the unit, the following routine maintenance procedures should be performed
in the time periods specified in Table 7-1. For a complete inspection check list see ASME CSD-1
chart.
In order to perform the maintenance tasks specified in Table 7-1, the following maintenance kits
are available through your local AERCO Sales Representative:
• Annual Maintenance Kit, Part No. 58025-11
• 24-Month Waterside/Fireside Inspection Kit, Part No. 58025-12 (See NOTE below)
NOTE
The 24-Month Waterside/Fireside Inspection Kit also includes the
items contained in the Annual Maintenance Kit (58025-11).
Therefore, only Kit Part No. 58025-12 is required when performing
the waterside/fireside inspections. Refer to Appendix L for
recommended spares.
TO AVOID PERSONAL INJURY, PRIOR TO SERVICING ENSURE THAT
THE FOLLOWING GUIDELINES ARE STRICTLY OBSERVED:
• DISCONNECT THE AC SUPPLY BY TURNING OFF THE SERVICE
SWITCH AND AC SUPPLY CIRCUIT BREAKER.
• SHUT OFF THE GAS SUPPLY AT THE MANUAL SHUT-OFF VALVE
PROVIDED WITH THE UNIT
• ALLOW THE UNIT TO COOL TO A SAFE WATER TEMPERATURE TO
PREVENT BURNING OR SCALDING
Table 7-1: Maintenance Schedule
Section Item 6 Mos. 12 Mos. 24 Mos.
7.2
*Inspect Inspect Replace 15 mins.
7.3
Main Flame Detector
(65136)
*Inspect Inspect Replace 15 mins.
7.5
*Check Check 1 hr.
7.6
Testing of Safety
Devices
45 mins.
7.9
*Inspect
Inspect, Clean &
Replace Gaskets
Inspect, Clean &
Replace Gaskets
30 mins.
7.10 Air Filter (88014) Replace Replace 15 mins.
* Only performed after initial 6 month period after initial startup.