1.5 Calibrations
1.5.1 Calibrate the hydraulic density control
WARNING: The machine or parts can move without notification.
The machine and its parts are heavy and can cause death or injury.
Park the machine on a clean, hard and level area.
Set the parking brake to ON and install the wheel chocks.
If an implement is on the machine, lower the implement to the ground.
Stop the engine and remove the ignition key.
Calibration of the hydraulic density control is necessary when you:
• Install the SimplEbale system.
• Replace the hydraulic valve.
• Do maintenance of the hydraulic density system.
To make sure that you calibrate the system to baling conditions, we recommend that you operate the PTO
and the hydraulics for 10 minutes. This makes sure that the oil is at the correct operation temperature. If this
is not done, the precision of the calibration can change and cause the pressure range for the valve to be
incorrect.
Procedure
1. Start the PTO and set the baler to work speed.
Fig. 9
2. Use the keypad to go to the hydraulic run page.
3. Use the keypad to select the
icon.
4. Press and hold the OK button to start the
calibration.
NOTE: A blue status bar fills until it is fully blue.
When fully blue, the calibration is done.
1 General
SimplEbale
79037906A
19