14 Chapter 2
Installation
Contents of this
Chapter
R Checking the Shipment on page 15
After you receive the analyzer, check all the items in the packing container.
R Environmental Requirements on page 18
Describes the system requirements needed to install the E5061A/E5062A and
how to secure space for heat radiation.
R Installing Front Handles/Rack Mounting Flanges on page 21
Shows how to mount the front handles used to transport the E5061A/E5062A
and how to install the flanges needed to install it in a rack.
R Connecting the Accessories on page 24
Provides information for connecting the mouse, keyboard, BNC adaptor, and
Ecal module to the E5061A/E5062A.
R Power Supply and Blown Fuses on page 28
Shows how to check the power supply as well as check and connect the power
cable. This section also describes what to do for a blown fuse.
R Starting the E5061A/E5062A on page 31
Describes turning on/off of the Power switch and cutting off the power supply.
R Setting the Internal Clock on page 33
Describes how to set the internal clock.
R Initial Registration of E5061A/E5062A on page 35
Describes initial registration of the Windows 2000 operating system.
R Daily Maintenance on page 38
Describes the daily maintenance for the E5061A/E5062A.