20
Installation
Introduction
This section reviews installation for the HP 5890 SERIES II (hereafter
referred to as HP 5890). The following topics are discussed:
C
Inspection of shipped materials
C
Instrument cooling
C
Connecting supply gases
C
Connecting cryogenic cooling
C
Power considerations
C
Signal cables
Shipment checklist
Retain shipping containers and material until contents are checked for
completeness and instrument performance is verified.
Items received should be checked against packing lists. If there are
discrepancies, contact your local Hewlett•Packardoffice immediately.