EasyManua.ls Logo

Alcatel-Lucent 7750 SR-a8 - 7750 SR-A System Installation Process

Alcatel-Lucent 7750 SR-a8
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7750 SR-a System Installation Process
46 7750 SR-a4 and SR-a8 Installation Guide
7750 SR-a System Installation Process
To install the 7750 SR-a system, perform the installation procedures in the following order:
Step 1. Prepare the site.
Step 2. Unpack the chassis and components.
Step 3. Mount the chassis.
Step 4. Prepare the chassis ground cables and make the grounding connections.
Step 5. Install at least one PSU.
Step 6. Prepare and connect the DC input power cables to a direct DC circuit, or connect
an AC power source.
Step 7. Install at least one CPM-a.
Step 8. Install at least one IOM-a.
Step 9. Install at least one MDA-a.
Step 10. Connect the network cables.
Step 11. Power up the system.
Step 12. Configure card slot, IOM, MDA, and port information.

Table of Contents

Related product manuals