122 Rockwell Automation Publication 2100-IN012G-EN-P - August 2016
Appendix A Bulletin 140G Unit Assembly Instructions
5. Install the bale on to the circuit breaker base.
The bale snaps into place on both sides of the circuit breaker base. (If the
bale does not snap in easily, check the orientation of the bale.)
6. Attach the line-side wiring and tighten to 53 lb•in (6 N•m) for G and H
frame units; tighten to 71 lb•in (8 N•m) for J Frame units.
7. Add the line terminal cover to the line side (not included in the kit).
8. Insert the terminal cover screw and washer (not provided with the kit),
and tighten to 8 lb•in (0.90 N•m).
9. Attach the load-side wiring and tighten to 53 lb•in (6 N•m) for G and
H frame units; tighten to 71 lb•in (8 N•m) for J frame units.
10. Install the load-side phase separators on the load side (not supplied with
the kit).
Verify that the phase separators are pushed down completely so that they
are flush with the cover.
IMPORTANT The circuit breaker must be in the ‘ON’ position to install the bale.
Base
bale
Handle Linkage
Stud
Notch in bale