Rockwell Automation Publication 2100-IN012G-EN-P - August 2016 133
Index
P
pilot light check 101
plug-in unit
11
plug-in unit removal
horizontal operating handle
57
vertical operating handle
52
power contacts check
101
power-factor correction capacitors
80, 98
pre-energizing check procedure
79
pre-energizing checklist
80
preparing MCC
80
product overview
11
publications
9
pull boxes
40
Q
qualified persons 79
R
rearranging sections 15
receiving
22
remove support pan
62
remove units
horizontal handle
57
SecureConnect
50
vertical handle 52
removing large units
55, 60
renewal parts
107
S
sections
adding
15
installation 15
lifting
23
numbering
15
rearranging
15
SecureConnect
50
seismic requirements
38
bolt down
38
IEEE 344
38
weld down
39
sequence numbering
14
series
lettering
20
number and series ID
17
shipping weights
23
export
23
standard 23
short circuit rating label
16
sections
16
units
16
shutters
56, 61
space factor
11
space saving design
circuit breaker install
121
circuit breaker removal
119
spacing requirements within the MCC
91
storage
24
support
104
support pan removal
62
ArcShield
62
swing-out door latches
60
switch lubrication
102
T
temperature
guidance
103
measurement
103
test
electrical insulation resistance
84
top entry conduit 44
U
UL label 16
UL/CSA marking
15
unit
construction
109
description
93
door removal 53, 57
horizontal handle removal
57
interlock
76, 77
interlock lever 71
latches
54
overheating
104
partially removed and locked 76, 77
removal
55
removed and locked
77, 78
space factor 11
type
11
vertical handle removal
52
unit door interlock 69
unit interlock
77
unit removal
60
using a padlock
76
V
vertical bus 12
vertical handle
49
vertical handle unit removal
52
W
weights 23
wiring
54, 55, 59, 84
integrity
84