EasyManua.ls Logo

Alto-Shaam 750-SK

Alto-Shaam 750-SK
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
De l uxe C ontro l Cook & Ho l d Oper a tors Manual MN- 46 7 0 8 Rev 1 11/20
35
Continued from previous page
Procedure To connect the electric power, do the following.
Step Action
1. Remove the top panel.
2. Install the cord grip into the back panel of the oven. Install the cord grip nut.
3. Install the cord through the cord grip. Route the ground wire to the terminal
block.
Continued on next page
TH-TS-011333
TH-TS-011335
TH-TS-011337

Table of Contents

Other manuals for Alto-Shaam 750-SK

Related product manuals