EasyManua.ls Logo

Ametek 3050-AM - Installing the Dryers

Ametek 3050-AM
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-8 | 3050 AM Moisture Analyzer
Installing the Dryers (Figures 3-4a and b)
Prior to operating the 3050 AM analyzer, the dryers must be installed.
Two dryers have been supplied with this analyzer. Make sure that you
have the two new dryers, and four new VCR gaskets available before
beginning installation.
The amount of time that the dryer fittings are left open should be kept
to less than a minute to avoid damage to the device.
1. On the right side of the rear of the analyzer is the dryer acess com-
partment (Figure 3-4).
2. Loosen the four captured screws on the door of the compartment to
remove the door.
4. You will install the one dryer in the top position (Sample System
Dryer), and the other in the bottom position (Zero Dryer).
5. Remove the dryer mounting screws that hold the dryers in place and
set them aside.
Figure 3-4a.
Dryer locations for installation.
Dryer Compartment
Cover
1/8" VCR Gasket
(2 ea dryer)
Dryer Mounting Screws
(2 each)
Zero Dryer
(bottom dryer)
Sample System Dryer
(top dryer)
!
CAUTION

Table of Contents

Related product manuals