Universal IV - Level Measurement System
8
1.7 Wiring the Electronic Unit
• Signalconnectionsaremadetothe3terminalblockon
the front of the chassis
• Duetolowpowerconsumption,onlylightgaugewiring
is needed; shielded twisted pair cables recommended
• Integralunitsarepre-wiredtothesensingelementat
thefactory.SeeFigure2-5
• SeeFigure2-6forwiringconnectionstotheremoteunit
• Thecablefromthesensingelementisconnectedtothe
terminal strip below the instrument chassis
CAUTION-BeforeusingIntrinsicSafetyBarrierread
manufacturer instructions for barrier operation
Figure 1-5
Universal IV Wiring Connections

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ametek Drexelbrook Universal IV and is the answer not in the manual?

Ametek Drexelbrook Universal IV Specifications

General IconGeneral
BrandAmetek
ModelDrexelbrook Universal IV
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals