3.1.5 Commissioning
Start-up checklist
Do not connect power until you have gone through the checklist
below
1.Arethewettedcomponents(gasket,flangeandsensing
element)resistanttothecorrosivepropertiesofthetank
product?
2. Does the information given on the nameplate correspond with
the application?
3.Exdapplications:Haveyouconnectedtheequipotential
bonding system correctly?
4.Exiapplications:Areyouusinganintrinsicbarrierwithin
the correct parameters?
5. Did you install cable entries of the correct internal diameter
so that there is a good seal around the cable? Are the
cable glands suitably certified per the application and the
hazardous area parameters?
6.Donotusetheearthterminalinthewiringcompartment:use
the equipotential bonding system.
3.2 The Compartment Cover
ViewportCleaning:TheviewportismadeofBorosilicateglass
and can be cleaned with any common glass cleaning product
(e.g.:Windex™,Isopropylalcohol,etc.)thatissuitableforthe
Class and Division rating of the specific system installation.
3.2.1 Opening the cover
Procedure
1. Unscrew cover stop, if applicable
2. Unscrew terminal compartment cover
3.2.2 Closing the cover
Warning: Ex d [ia] applications
Check that the terminal compartment cover is screwed tight and
thecoverstop(ifapplicable)isfastenedtightlytothecover.