EasyManua.ls Logo

Ametek Powervar Security II Series - Installation Procedures; Inspect Equipment and File Claims; Battery Recharge Date Check

Ametek Powervar Security II Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
A01-00055 Rev N
3.0 INSTALLATION
Inspecting the UPM
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and le
a claim for shipping damage:
1. File with the carrier within 15 days of receipt of the equipment;
2. Send a copy of the damage claim within 15 days to your service
representative.
NOTE:
Check the battery recharge date on the shipping carton label. If the
date has passed and the batteries were never recharged, do not
use the UPM. Contact your service representative.

Related product manuals