EasyManua.ls Logo

Ametek Spectrolab LAS01 - 5 Initial Start-up; 5.1 Pre-Operation Checks

Ametek Spectrolab LAS01
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Initial start
-up
24 SPECTROLAB
23.07.2020
5 Initial start-up
5.1 Preparing the instrument for use
Before switching on the instrument, proceed as follows:
1. Check whether the power supply of the instrument supplies the correct input
voltage.(198 - 253 VAC, 50/60 Hz).
2. Check if the mains voltage selector switch of the PC is set to the proper input
voltage (230V/115V).
3. Check the filling level of the gas-washing bottle. Fill with water if required, see
page 45.
4. Set the argon pressure to 4.8 - 5.0 bar (69.6 - 72.5 psi).
If the argon pressure is not properly set, turbulences result in the spark
stand insert. Thus, correct measuring results cannot be obtained.
The instrument is ready for use.

Related product manuals