EasyManuals Logo

Anderson TRB-2000 User Manual

Anderson TRB-2000
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #19 background imageLoading...
Page #19 background image
17
When you load the second bale, it will be placed on the platform on the same side as the
loading arm.
To load the bale on the second row, extend the loading arm when it is raised to the middle of
his stroke. Then complete the loading of the bale on top of the first row.
To operate the pusher, lower the loading arm to around the middle of its trajectory. The pusher
moves the bale toward the back of the trailer. Once the pusher has reached the end of its
trajectory, bring it back to its initial position.
Load other bales before operating the pusher again and then repeat the procedure to complete
de load.
For safe transportation between the field and storage site, loading must be done as there are
only two bales in the back of the trailer. (Figure 5.3)
Figure 5.3 Trailer full load
When the first bales loaded reach the far end of the trailer, the full load indicator warns that
there remains space for only 2 more bales to be loaded onto the trailer. Do not operate the
pusher when the white indicator is visible. Figure 5.4 shows the full load indicator.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Anderson TRB-2000 and is the answer not in the manual?

Anderson TRB-2000 Specifications

General IconGeneral
BrandAnderson
ModelTRB-2000
CategoryFarm Equipment
LanguageEnglish

Related product manuals