EasyManua.ls Logo

Anet A8 Plus - Power Line

Anet A8 Plus
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. When all wiring is plugged in, please remove the zip ties on the black belt, plug in the power line, turn on the machine for
trial operation(please refer 7.2 First Printing ), and then install the mainboard shell after everything is normal.
There is no need to separate
positive and negative electrodes
(+ red line , - black line )
Heating bed thermistor
Heating bed
TF card port

Related product manuals