EasyManua.ls Logo

APT VEYRON E 8KW - Load and Charger Priority Displays

Default Icon
81 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
1.892V/cell ~ 1.975V/cell
1.975V/cell ~ 2.058V/cell
> 2.058V/cell
Load Information
Indicates overload.
Indicates the load level by 0-24%, 25-49%, 50-74% and 75-100%.
0%~24%
25%~49%
50%~74%
75%~100%
Charger Source Priority Setting Display
Indicates setting program 16 “Charger source priority” is selected as
“Solar first”.
Indicates setting program 16 “Charger source priority” is selected as
“Solar and Utility”.
Indicates setting program 16 “Charger source priority” is selected as
“Solar only”.
Output source priority setting display
Indicates setting program 01 “Output source priority” is selected as
“Utility first”.
Indicates setting program 01 “Output source priority” is selected as
Solar first”.
Indicates setting program 01 “Output source priority” is selected as
SBU”.
AC Input Voltage Range Setting Display
Indicates setting program 03 is selected as “ ”. The acceptable
AC input voltage range will be within 90-280VAC.
Indicates setting program 03 is selected as “ . The acceptable
AC input voltage range will be within 170-280VAC.
Operation Status Information

Table of Contents

Related product manuals