EasyManuals Logo

APV PS 120 M1 User Manual

APV PS 120 M1
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
30
5.3 Regulating the seed flow rate (calibration test)
Purpose
During the calibration test, the seed quantity for a specific area is defined.
Requirements
The following requirement must be fulfilled for this work step:
The implement is disconnected from the power source, see Disconnecting the
seed drill from the power source On page 40.
Required components, tools and materials
For this work step, the following components, tools and materials are required:
Calibration bag
Hexagon key
Procedure
This is how to perform a calibration test:
Step Description Explanation
1 Loosen the hexagonal bolt (2) on the
calibration slide (1).
2 Take the calibration slide out of the an-
choring and turn it by 180°.
3 Attach the rotated calibration slide back
onto the seeder.
Result:
4 Hook the calibration bag onto the cali-
bration slide.
5 Select a suitable brush pressure, see
Setting the brush pressure On page
35.

Table of Contents

Other manuals for APV PS 120 M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the APV PS 120 M1 and is the answer not in the manual?

APV PS 120 M1 Specifications

General IconGeneral
BrandAPV
ModelPS 120 M1
CategorySeeders
LanguageEnglish

Related product manuals