Pre-Installation Preparation
2 Removing the Existing Differential
Removing the Differential Assembly
Checking the Current Backlash Amount
Removing the Differential Center
3 Installing the Air Locker
Installing the Carrier Bearings
Approximate Backlash Shimming
Installing the Bearing Sleeves
Calculation & Selection of Preload Shims
Drilling & Tapping the Bulkhead Port
Installing the Seal Housing
Setting Up the Bulkhead Fitting
Bench Testing the Air Locker
Reinstalling the Differential Assembly
4 Installing the Air System
Running & Securing the Air Line
Connection to the Bulkhead Fitting
5 Mounting & Connecting the Electrical System
Mounting the Actuator Switch(es)
Wiring the Actuator System
6 Testing & Final Assembly
Testing the Air Locker Actuation
Re-Sealing & Filling the Differential
Post-Installation Check List
Exploded Assembly Diagram