EasyManua.ls Logo

ASD FieldSpec 3 - Chapter 2: Setup Procedures; Unpacking the Spectroradiometer

ASD FieldSpec 3
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 2010 ASD Inc. 11 FieldSpec® 3 User Manual
Chapter 2 Setup
Inspect the shipping container and take careful notes regarding any damage
that might have occurred during shipping.
Note: Save all packing materials, foam spacers, and paperwork for possible future
use.
Prepare a clear space on a sturdy bench or counter, ideally, a space near a
wall-current receptacle and the controlling computer.
Carefully open the shipping container following all instructions and
orientation labels on the container.
2.1 Unpacking the Instrument
Step 1 Carefully remove the instrument from its shipping case.
Use the nylon straps at the top of the Ergonomic Pro-Pack and the hip belt at
the bottom.
Figure 2-1 FieldSpec spectroradiometer carrying case and foam inserts.

Table of Contents

Related product manuals