64
EN
Check list – Testing before initial operation
Fitting and installation
Check and document the correct fitting and installation of all components in the
escape route. For this purpose, use the test book provided by ASSA ABLOY
Sicherheitstechnik (D01350xx, page34).
Function check
Checking and documenting locking
1 Close the door.
2 Activate the locking element.
Identifier Yes No
Do the red LEDs light up?
Is the door securely locked? (test manually)
3 Press the emergency button.
Identifier Yes No
Is the door released? (test manually)
Can the door be opened without using considerable effort?
Are the yellow and green LEDs on the terminal illuminated?
Does the integrated acoustic alarm sound?
Checking and documenting alarms
1 Activate the locking system.
Identifier Yes No
Do the red LEDs light up?
Is the door securely locked? (test manually)
Check list – Testing before initial operation