6 TRANSPORTATION
69
RT-40 US O&M
0404-766 2019-05
When lifting the machine, attach suitable lifting chains / straps to all
four lift points and lift vertically as shown. Chains / straps must
remain vertical throughout the lifting operation (fig. 6.5-1).
The spreader beam pictured above is a general representation only. It’s pur-
pose is to illustrate that the lifting chains must remain vertical during lifting.
Weight of
machine being
lifted must not
exceed 4500 lb
(2041 kg).
4500 lb (2041 Kg)
6.5-1