- 42 -
Check Alternator vibration damper xx
Light tower
Check if mast cables are not frayed or damaged. Replace immediately if
damaged.
x
Check support connection bolt of projectors xx
Check adjustable plates condition x
Check electrical cable condition and upper fixation clamp xx
Grease the mast collar xx
Grease the mast adjustable plates (contact surface only) xx
Grease cylinder rotule xx
Change hydraulic oil x
Inspection by Atlas Copco Service technician
Light towers in stand-by application have to be tested on a regular basis. At
least once a month the engine should run for minimum 30 minutes at a high
load (50% - 70%) that the engine reaches its operating temperature.
Maintenance schedule
Daily
50 hours after initial
start-up
Every 500 hours Every 1000 hours Yearly
Service pack
- - 1636 3104 13 - -
00_00_HiLight H5+-H2_EN.book Page 42 Thursday, February 27, 2020 3:23 PM