EasyManua.ls Logo

Atlas Copco QAS 500

Atlas Copco QAS 500
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 68 -
5 Maintenance
5.1 Maintenance schedule
Before carrying out any maintenance activity, check that the start switch is in position O and that no electrical power is present on the terminals.
Maintenance schedule Daily
50 hrs
after initial
start-up
Every 500
hours
Every 1000
hours
Every 2000
hours
Yearly
Service pak - - 2912 4505 04 2912 4506 05 2912 4507 06 -
For the most important subassemblies, Atlas Copco has developed service kits that combine all wear parts. These service kits offer you the benefits of genuine parts,
save on administration costs and are offered at reduced price, compared to the loose components. Refer to the parts list for more information on the contents of the
service kits.
Drain water from fuel filter x
Check/Fill fuel level (3) x
Empty air filter vacuator valves x
Check air intake vacuum indicators x
Check engine oil level (if necessary top up) x
Check coolant level x
Check control panel for alarms and warnings x
Check on abnormal noise x
Check function of coolant heater (option) x x
Replace air filter element (1) x x
Check/Replace safety cartridge x
Change engine oil (2) (6) xx x
Replace engine oil filter (2) x x x
Replace by-pass lubricating oil filter x x x
Replace fuel (primary)filter(s) (5) xx

Table of Contents

Related product manuals