Chapter 5: Installing ISDN BRI hardware
Contents
This section contains information on the following topics:
Installing ISDN BRI hardware for line applications on page 15
Installing ISDN BRI hardware for trunk applications on page 37
Selecting the card slots on page 38
Removing the module cover for card installation on page 38
Installing the MISP on page 38
Installing the clock reference on the SILC on page 38
Installing the SILC and the UILC on page 41
Connecting the system to the Main Distribution Frame (MDF) on page 41
Cross-connecting the Main Distribution Frame (MDF) on page 41
Card location forms on page 42
Installing ISDN BRI hardware for line applications
The following lists the procedures for installing ISDN BRI hardware for line applications. The
system must already be installed and operating according to the instructions in Avaya
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
(NN43021-310) before performing these procedures.
For a successful installation, perform these procedures in the order listed below:
1. Select the card slots where the ISDN BRI cards will be located.
2. Remove the module cover for card installation.
3. Install the Multi-Purpose ISDN Signaling Processors (MISPs).
ISDN Basic Rate Interface Installation and Commissioning March 2011 15