Maintenance Object Repair Procedure
555-233-142
8-980 Issue 1 May 2002
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external CDR
output device. If the link has been disconnected already, this test just returns
PASS. Every resource allocated for a CDR link is released after this test.
Table 8-413. Test #213 Link Tear Down Test
Error
Code
Tes t
Result Description / Recommendation
40 ABORT Internal system error.
50 ABORT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
1010 ABORT The CDR link has been busied out to out-of-service.
1. Enter the release cdr primary|secondary command to release the CDR
link from busyout state.
2. Retry the test cdr primary|secondary long command to execute the test.
2012 ABORT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
PASS The CDR link is torn down.
Continued on next page