S-SYN-PT (Speech Synthesis Port)
Issue 1 May 2002
8-1021555-233-142
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. For example, by clearing error codes associated with the
NPE Crosstalk test (#6), you may also clear errors generated from other tests in
the testing sequence.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive, ND = Nondestructive
Speech Synthesis PSS Handshake test (#168) X X ND
NPE Crosstalk test (#6) X ND
Conference Circuit test (#7) X ND
Speech Synthesis DTMF Receiver test (#163) X ND
Speech Synthesis Memory test (#166) X X ND
Speech Synthesis DSP Tone test (#165) X X ND
Speech Synthesis SSD Inquiry test (#167) X X ND
Speech Synthesis DTMF Receiver Inquiry test (#164) X X ND
Speech Synthesis Parameter Update test (#169) X X ND