EasyManua.ls Logo

b2 electronic BA60 - Instrument Disconnection and Termination

b2 electronic BA60
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Test Procedure
40 DHV0017 b2 EN © b2 electronic GmbH
Step
Procedure (Reporting)
Example
Clear Reports
To delete all stored reports, click “OK” on menu
“Clear Reports”.
7.11 Instrument Disconnection and Termination
After performing a test, adhere to the following recommendations and
instructions:
1. Turn OFF the instrument, by pressing for one second the On / Off button
2. Remove the power supply source from the input plug (if applicable).
3. Remove the ground connection (if applicable).
4. Remove the test vessel from the test chamber.
5. Discard the tested sample liquid from the test vessel according to local
environmental regulations.
6. Fill the test vessel with fresh oil for storage.

Related product manuals