7 Test Procedure
© b2 electronic GmbH DHV0017 b2 EN 29
7.6 Standard Test Execution
Procedure (Run Standard Test)
Use the Up / Down arrows to place the cursor on the
desired standard test.
The nomenclature includes the year the standard was
approved. In some cases the gap is also included by
the value preceding „mm“.
Click “OK” to select the chosen standard.
More sequences and the user sequences are displayed.
The voltage “Rise” rate and electrode “Gap” for the
chosen standard are displayed. These values are
pre-programmed and cannot be adjusted by the user.
Click “OK”, with the cursor on “Start Test”, to activate
the test.
Before executing a standard test, the test vessel must be correctly installed
in the test chamber.
The electrode gap spacing is not assessed automatically by the BA instrument.
It is the BA operator’s responsibility to verify that this variable correspond to
the specified value by the standard.
The USB memory stick has to be inserted into the instrument in order to
save test results before start of testing! Results are stored as a pdf-file.
At the bottom of the BA display screen the communication port status will
be displayed. “USB-Sign” is displayed when the USB memory stick is
inserted in the communication port.