7EtherNet/IP Connection Procedure
24
4
The Project Properties Dialog
Box is displayed.
*In this guide, "New Project" is
used as the project name.
Check that the device used is
shown in the Category and
Device Fields of Select Device.
Select an applicable version
from the pull-down list of
Version.
*Although 1.14 is selected as
an example in this guide,
select the version you actually
use.
5
Click Create.
6
The New Project is displayed.
The following panes are
displayed in this window.
Left: Multiview Explorer
Top right: Toolbox
Bottom right: Controller Status
Pane
Top middle: Edit Pane
The following tabs are
displayed in the bottom middle
of this window.
Output Tab Page
Build Tab Page
Controller
Status
Pane
Toolbox
Edit Pane
Multiview
Explorer
Output Tab
Page
Build Tab
Page

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Balluff BNI EIP-50 105-Z015 Series and is the answer not in the manual?

Balluff BNI EIP-50 105-Z015 Series Specifications

General IconGeneral
BrandBalluff
ModelBNI EIP-50 105-Z015 Series
CategoryControl Unit
LanguageEnglish

Related product manuals