22
Operating Manual for BAUER LINESTAR 9000 with hose feed
10.3 FURROW GUIDANCE
Max. deviation of the straight line
10.4 CABLE GUIDANCE INSTALLATION AND ADJUSTMENT
1. The Cable Guidance system consists of an above ground cable that is supported by a line of pipe posts which
are placed every 6 m. For installation be sure to observe the following two conditions:
A. The posts must be located in a perfectly straight line.
B. The cable must be properly tensioned.
2. Posts: The posts must be paralleled to the ditch (ditch feed) or to the track of the central tower (hose feed)
respectively.
They must be placed every 6 m in a straight line. The last posts at the end of the field must be solidly embedded in
the soil by ground anchors to withstand the cable tension.
Steuerarm
Steering Arm
Steuereinheit
Control Unit
Kufe
Skid