EasyManua.ls Logo

Bauer LINESTAR 9000 - Service Plan

Bauer LINESTAR 9000
115 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52
Operating Manual for BAUER LINESTAR 9000 with hose feed
18.2 SERVICE PLAN
Extent of Service
Intermediate
maintenance
Annual
maintenance
Central unit
Check all screwed joints
X
Check tightness of electric cable entries into the control centre
X
Check tightness of connecting hoses in the riser pipe
X X
Trussing, overhang, coupling
Check all screwing on flanges, truss rods, braces, on towers and on overhang
X
Check tightness of connecting hose at tower couplings.
X
Lubricate ball joint of tower couplings
X X
Empty sand trap
X X
Booster pump – spinning of shaft between engine and pump – check if pump rotor rotates
freely (if existing)
X
Check end gun (if existing)
X
Tower box, transmission device
Check switch cam and adjust if necessary
X
Check shifting travel of micro switches
X X
Check function of micro switches (operation switch and safety switch)
X
Check all electric connections for contact
X
Check tightness of all cable entries into the alignment control
X
Check tightness of alignment control covers
X
Lubricate the ball joints at transmission parts
X X
Exact control – Check tension of guiding cables
X
Visual inspection of span alignment
X X
Check function of switches for intermediate stop, end stop and of programme switch
X

Table of Contents

Related product manuals