52
Operating Manual for BAUER LINESTAR 9000 with hose feed
18.2 SERVICE PLAN
Extent of Service
Intermediate
maintenance
Annual
maintenance
Central unit
Check all screwed joints
X
Check tightness of electric cable entries into the control centre
X
Check tightness of connecting hoses in the riser pipe
X X
Trussing, overhang, coupling
Check all screwing on flanges, truss rods, braces, on towers and on overhang
X
Check tightness of connecting hose at tower couplings.
X
Lubricate ball joint of tower couplings
X X
Empty sand trap
X X
Booster pump – spinning of shaft between engine and pump – check if pump rotor rotates
freely (if existing)
X
Check end gun (if existing)
X
Tower box, transmission device
Check switch cam and adjust if necessary
X
Check shifting travel of micro switches
X X
Check function of micro switches (operation switch and safety switch)
X
Check all electric connections for contact
X
Check tightness of all cable entries into the alignment control
X
Check tightness of alignment control covers
X
Lubricate the ball joints at transmission parts
X X
Exact control – Check tension of guiding cables
X
Visual inspection of span alignment
X X
Check function of switches for intermediate stop, end stop and of programme switch
X