Table of contents
3.1 Transport and Unpacking 18
3.1.1 Transport 18
3.1.2 Unpacking 18
4 Mounting 19
4.1 Installation in the control cabinet 19
4.1.1 Preparation of the control cabinet 19
4.1.2 Installation in a control cabinet wall 19
4.1.3 Earthing measures 19
4.1.4 Mounting of the Control Panel 20
4.1.5 Fitting the power supply cable 21
4.2 Connecting the Control Panel 22
4.2.1 Connecting cables 22
4.2.2 Protective Earthing 22
5 Operating Instructions 23
5.1 Switching the Control Panel on and off 23
5.1.1 Switching on 23
5.1.2 Shutting down and switching off 23
5.2 Operation 23
5.3 Servicing and maintenance 24
5.3.1 Cleaning 24
5.3.2 Maintenance 24
5.4 Emergency procedures 24
5.5 Shutting down 24
5.5.1 Disposal 24
6 Troubleshooting 25
7 Assembly dimensions 26
8 Technical Data 27
9 Appendix 28
9.1 Beckhoff Support and Service 28
9.1.1 Beckhoff branches and partner companies 28
9.1.2 Beckhoff company headquarters 28
9.2 Approvals for USA and Canada 29
9.3 FCC Approvals for the United States of America 29
9.4 FCC Approval for Canada 29
2 CP29xx