STEP 5
( Powerside Runway Installation )
1. Locate the powerside runway easily identified by the
cylinder and sheave roller mounting structures welded on the
underside. The powerside runway will be positioned on the
side of the lift where the power unit is installed. (See Fig. 5.1)
2. Install cylinder and cable block as shown.
(See Fig. 5.2 & 5.3)
3. Remove any pre-installed cable sheaves from the power-
side runway making sure to pay attention to the order in which
they are removed. (This will help at the time of re-installation.)
(See Page 14.)
4. Position the Powerside Runway on top of the Cross Tubes
with the utility rail towards the center. The fitting holes located
at the side of the Powerside Runway should be adjacent to
the Power Unit Column. Align the holes in the runway with
the holes on the Cross Tubes and bolt together using four
M12 x7.75 x 90 hex bolts and washers. (See Fig. 5.4 )
STEP 6
( Offside Runway Installation )
1. Position the offside runway on top of the cross tubes
with the utility rail located inside. (See Fig. 6.1)
DO NOT PROCEED with cable installation or go near the lift
work area unless visual confirmation is made of ALL safety
locks. ALL locks MUST be engaged before proceeding.
Failure to comply with these instructions may result in
severe personal injury or death. ( See page 11. )
Fig. 5.1
Fig. 5.2
Fig. 5.4
Fig. 6.1
Fig. 5.3
13