Installation Checklist
Following are the steps needed to install a P-9000LT/F Lift. Perform them in the order shown.
☐ 1. Review the installation Safety Rules.
☐ 2. Plan for Electrical Work.
☐ 3. Make sure you have the necessary Tools.
☐ 4. Select the Installation Location.
☐ 5. Make sure there is adequate clearance on all sides of the Lift.
☐ 6. Create the Concrete Cutouts (P-9000LTF only).
☐ 7. Create Chalk Line Guides (P-9000LT only).
☐ 8. Lift the Platforms off the Bases.
☐ 9. About Embedment.
☐ 10. Anchor the Bases.
☐ 11. Set up the Console and attach the Power Unit.
☐ 12. Connect the Hydraulic Hoses for a Standard 208-240 VAC Power Unit.
☐ 13. Connect the Hydraulic Hoses for a 110 VAC Power Unit.
☐ 14. About Compression Fittings and Tubing.
☐ 15. Connect the Air Line.
☐ 16. Connect the Buttons.
☐ 17. Connect the Return Line.
☐ 18. Connect to Power.
Requires an Electrician
.
☐ 19. Install a Power Disconnect Switch.
Requires an Electrician
.
☐ 20. Install a Thermal Disconnect Switch.
Requires an Electrician
.
☐ 21. Fill the Hydraulic Fluid Reservoir.
☐ 22. Test the Lift.
☐ 23. Add the Ramps (P-9000LT only).
☐ 24. Review the Final Checklist.