EasyManuals Logo

BendPak XPR-9 Series User Manual

BendPak XPR-9 Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
XPR-9 Series Two-Post Lifts
20
P/N 5900371 — Rev. D2 — May 2023
Install the Equalizing Cables
It is much easier to put the Equalizing Cables into position before you stand up the Posts.
The Equalizing Cables keep the Lift Heads synchronized. If one Lift Head lowers or raises faster than
the other Lift Head; the Vehicle on the Lift would become unstable and could fall.
The following illustration shows an Equalizing Cable; the ends are exaggerated for clarity.
When Equalizing Cables are fully routed, they are mirror images of each other.
XPR-9TF:
(2X) Cable Assembly
5595746
XPR-9SBT:
(2X) Cable Assembly
5595359

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BendPak XPR-9 Series and is the answer not in the manual?

BendPak XPR-9 Series Specifications

General IconGeneral
BrandBendPak
ModelXPR-9 Series
CategoryLifting Systems
LanguageEnglish

Related product manuals