EasyManua.ls Logo

BendPak XPR-9 Series - Page 31

BendPak XPR-9 Series
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
XPR-9 Series Two-Post Lifts
31
P/N 5900371 — Rev. D2 — May 2023
The Offside Safety Assembly is mostly the same as the Power Side Safety Assembly, except that
it does not have a handle.
The procedures for installing the Power Side Post and the Offside Post Safety Assemblies are similar,
but not exactly the same.
Use the illustrations on the previous page to complete the procedures below.
To install the two Safety Assemblies:
1. Starting on the Power Side Post, locate the Safety Assembly with the Safety Lock Release
Handle, a Safety Clevis Pin, a Torsion Spring, and a Hair Pin.
Refer to the previous drawings for locations of the components of the Safety Assemblies.

Related product manuals