7 Operation and Control BigRep STUDIO
76
Standard Operation
Load Object
a. Load from USB storage device
› Connect the USB storage device to the printer.
› Go to the Print Menu, select ‘Load File’. See Fig. 7-8.
› Choose the file you would like to print and click on Open.
› Remove the USB storage device.
› File can now be found on the printer.
b. Load from the Web Interface
› Click on ‘Upload File’ on the File Section.
Chap. 6 Interface
› Select your file and click on open
Initiating the Printing Process
› Go to the Temperature Menu and heat up the bed and the hotends.
Chap. 6 Interface
› Locate a filament spool on the spool holder.
Chap. 8.1 Changing Filament
› Load filament into the extruder. Use the Load Filament button in the Tem-
perature Menu and follow the instructions on the UI.
If you would like to load filament in T0 and T1, wait for the first loading pro-
cedure to be finished before starting the second one.
Fig. 7-8 : Load File