THE REACTOR MUST BE PROPERLY CONNECTED TO
EARTH AS PER THE DIAGRAM BELOW
The earth wires marked and are supplied with the UV reactor.
The earth wire marked must be connected when the reactor is installed on site (6 mm² minimum
COMPULSORY)
Any earthing fault of the reactor will lead to an exclusion of the guarantee in
the event of electrolytic corrosion.
6 mm² minimum
6 mm² minimum
6 mm² minimum
2
3
3
2