12
Complete User manual
Position Pro
Put Pro in a vertical position on a horizontal surface below the kitchen sink. Make sure that the
surface can support Pro
Position Pro near the cold water supply, the drain and an earthed electrical supply.
• Make sure that it is easy to see the control panel.
• Make sure that the front cover can be opened to get access to the prefilters.
• Hoses and cables can go in all directions from the connection point. Make sure that nothing can crush them or cause damage to them.
Figure 12.
A
B
C
D
D
D
D
Position Pro
Pos Description Pos Description
A 460 mm (18”) C 482 mm (19”)
B 190 mm (7 1/2”) D min. 20 mm (1”)
Affix information decal
Figure 13. Affix information decal