EasyManua.ls Logo

Bomag BPR 35/60 - Pre-Operation Checks

Bomag BPR 35/60
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
BOMAG24 BPR 35/60
5.1 General
If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter "Indicators
and control elements" before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
5.2 Tests before taking into op-
eration
The following inspections must be carried out be-
fore each working day or before a longer working
period.
Danger
!
Danger of accident!
Please observe strictly the safety regulations
in the corresponding section of this instruc-
tion manual!
l Park the machine on ground as level as possi-
ble.
l Cleaning the machine.
Check:
l condition of engine and machine.
l fuel tank and fuel lines for leaks.
l screw connections for tight fit.
Note
i
For a description of the following tasks refer to the
chapter "Daily maintenance".
l Check the engine oil level, top up if necessary.
l Check the fuel level, top up if necessary.
Go to Discount-Equipment.com to order your parts

Related product manuals