7
3.1.1 INSTALL WIND VANE
precision screwdriver.
Step 1 Step 2
3.1.2 INSTALL RAIN GAUGE FUNNEL
Install the rain gauge funnel and rotate clockwise to lock the funnel to the sensor array
Lock
grooves
Step 2
Step 1
3.1.3 INSTALL RECHARGEABLE BATTERIES
Step 1: Unscrew the battery door at bottom of unit and
take out the cable socket.