SECTION
I
MACHINE
INSTALLATION
1.1
PREPARATION OF
THE MACHINE LOCATION
1.1.1
Foundation and Clearances
When
setting the
machine on a
prepared
foundation
of concrete
(optional)
or on the shop
floor,
use shim
plates,
adjustable
mounting pads or
thin
grouting
to
compensate
for unevenness
in the
floor.
Figure
1-2
shows the
base dimensions and the 17
mm
(27132")
diameter clearance
holes
for
16 mm
(S/a':;.6o1,s,
should it
be required
to
bolt the machine
to
t}re floor.
Figure 1-3
shows
the necessary clearances
around
the
machine for
access
door
opening
for
maintenance and to
continue the
remainder
of the installation.
1.2 ELECTRICAL
SERVICE
1.2.7 Referencelnformation
The machine is
wired
f.or
27O,22O,2+O,380 v
or
4OO, 42O,44O, 460,480 v and
all
fused 20
amps.
Check the label
on
the outside of the
Power Equipment Enclosure
on the side
of the
machine
to
determine
the
exact figures for your
installation.
The electrical
service entry is at the rear of
the
Power Equipment Enclosure
(see
Figure 1-3)
where
a 20
mm
diameter hole has
been
provided for
electrical conduit fittings.
WARNING:
DO NOT
CONNECT
ELECTRICAL
SUPPLY
AT
THIS STAGE
7-2