EasyManua.ls Logo

Bridgeport Interact 2 - Table of Contents; List of Contents

Default Icon
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section
II
III
IV
VII
1.1
7.2
LIST OF CONTENTS
MACHINE INSTALLATION
Preparation of the Machine Location
Electricd
Service
PREPARATION FOR
OPERATION
2.7 Cleaning the
Machine
2.2 Lubrication
MACHINE
COMMISSIONING
3.1
General
3.2
CommissioningProcedure
MACHINE MAINTENANCE
-
THEORY
OF
OPERATION
4.7
The XY Servo Motor Drive
+.2
Knee
Drive
+.3
Lubricating
System
4.+
TheZ Axis Drive
4.5
The
Milling,
Drilling
and Boring
Head
4.6 Specification
POWER DISTRIBUTION
5.1
Power Disuibution
CONTROL AND AXIS DRIVES
Axis
Drive
Unit System
Description
Replacement
of Axis
Drive
Unit
Conuol System Description
Fitting
a New
Controller
Sofrware Limits
Controller Buffer Battery Replacement
Page
7-2
7-2
7-2
2-l
2-l
2-7
3-1
3-1
3-7
4-1
4-r
4-r
+l
4-2
+-3
+-4
5-1
5-1
6-7
6-7
6-7
6-3
6-3
64
6-5
7-7
7-7
7-3
7-8
7-9
7-12
7-1+
7-17
7-20
7-22
V
VI
6.1
6.2
6.3
6.4
6.5
6.6
BASE ASSEMBLY
AND
MAINTENANCE
7.1 Drive Belt Replacement
7.2 XtA V Axis Diive Motor
Replacement
7.3
7.4
7.5
7.6
7.7
7.8
7.9
Table and
Saddle
Removal
X&YAxisBallscrew
Air Assist
Pedestal
Limit Switch Replacement
Lubrication
X&YAxisGibs
Lost Motion
&
Backlash
Compensation
BT/%M/10A2

Table of Contents

Related product manuals