EasyManua.ls Logo

Brivis Contour Series - 12�5 Brivis AD Bleed Setting Instructions; 12�6 Brivis AD Optional Dump Valve Functions

Brivis Contour Series
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Brivis 24 Evap AC IM
12.5 BRIVIS AD BLEED SETTING INSTRUCTIONS
Loosen the thumb screw, rmly grip the over ow pipe, and rotate it.
Move the bleed tray further under the pad to increase the bleed rate or further away from the pad to decrease it�
Measure to conrm the required bleed rate and then tighten the thumb screw.
NOTE
Ensure the arrow of the overow pipe assembly sits between the leg of the locking bracket.
12.6 BRIVIS AD DUMP VALVE FUNCTIONS
The Dump Valve empties the tank after the Cooler is turned OFF, leaving it dry
When using the Cooler again, relling the tank will take 4 minutes before Pre-Wet begins. When the Cooler is 
turned OFF at the end of use, the Dump Valve will wait 45 minutes before turning OFF the water supply and
draining the tank�
If the Cooler is in continuous operation, the Dump Valve will ush the tank automatically after 35 hours of pump 
operation�
NOTE
This is not 35 hours of Cooler operation, but 35 hours of actual pump operation.
NOTE
The entire Start Up sequence, including Pre-Wet could be as long as 8 minutes in some cases, if
the Cooler has been OFF for more than 45 minutes.
12. WATER CONNECTION

Table of Contents

Other manuals for Brivis Contour Series

Related product manuals