EasyManua.ls Logo

Bruker InsightMR - Adding a New Protonated Solvent

Bruker InsightMR
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Flow Unit Installation
38 H155936_3_003
6.6.3 Adding a New Protonated Solvent
Refer to the Edlock Guide (under the help button (?) / Manuals in TopSpin) to add the
new solvent and its properties in the edlock table.
Ensure the new solvent will also be shown in IconNMR.
Non deuterated solvents must have XAU lctshim flow and LOCK-OFF as Associated
Shim and Lock Routine respectively, as shown in the previous section.

Table of Contents